Qatar-Bahrain causeway redesign ready 13-04-13 07:28 PM DOHA: The third redesign of the 40-km Qatar-Bahrain causeway is almost ready — 12 years after the project was proposed. The revised project with an estimated cost of $2.9bn is likely to have four vehicle lanes and two railway tracks, Bahrain’s Gulf ... Source... |
الساعة الآن 04:19 PM |
Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.5.2 TranZ By
Almuhajir