إنضمامك إلي منتديات استراحات زايد يحقق لك معرفة كل ماهو جديد في عالم الانترنت ...

انضم الينا
استراحات زايد الصفحة الرئيسية


إضافة رد
 
LinkBack أدوات الموضوع انواع عرض الموضوع
  #1  
قديم 05-06-2010, 02:20 PM
عضو ماسي
بيانات محروم.كوم
 رقم العضوية : 503
 تاريخ التسجيل : Dec 2007
الجنس : female
علم الدوله :
 المشاركات : 2,100,611
عدد الـنقاط :3341
 تقييم المستوى : 2139

Lately my daily digest has not been going out, and there have been no configuration changes between the last successful run two days ago and today. Yesterday it did not run, and today it is already past time.

I have about 500 of these that need to go out, and the groups are depending on the successful delivery of these digests.

I've reviewed the docs and searched this forum to no avail.

Here are some facts:
  • The admincp > maintenance > diagnostics > Email test ran successfully
  • The task is set to run at 6am. It is past 6am and has not run
  • The Scehduled task log says it will run next today at 6am
  • Some of the other scheduled tasks have run already
  • Some of the other tasks say their next run is today at 3:56 am, 4:00 am, etc. All are past due.
What do I do to trouble shoot and/or fix this?


I have tried the "Run Now" button on some of the other past due tasks, and it does not run the task.

Please help.
__DEFINE_LIKE_SHARE__
رد مع اقتباس
إضافة رد

مواقع النشر (المفضلة)


تعليمات المشاركة
لا تستطيع إضافة مواضيع جديدة
لا تستطيع الرد على المواضيع
لا تستطيع إرفاق ملفات
لا تستطيع تعديل مشاركاتك

BB code is متاحة
كود [IMG] متاحة
كود HTML معطلة
Trackbacks are متاحة
Pingbacks are متاحة
Refbacks are متاحة



الساعة الآن 03:31 AM


Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.5.2 TranZ By Almuhajir

RSS RSS 2.0 XML MAP HTML